Phase 1 – Work on Rue Sainte-Catherine Ouest

Lot 1A: between De Bleury and Robert-Bourassa

  • Start of work operations in March 2019, continuing until the fall of 2019
  • Winter break
  • Resumption of work operations in May 2020
  • End of work operations in the fall of 2020

Lot 1B: between Robert Bourassa and Mansfield

  • Start of work operations in May 2020, continuing until the fall of 2020
  • Winter break
  • Resumption of work operations in the spring of 2021
  • End of work operations in the fall of 2021

Lot 2A: Square Phillips - decontamination of the old public toilets

  • Start and end of work operations in 2019

Lot 2D: Square Phillips and Rue Union

  • Start of work operations in October 2020
  • End of work operations in the summer of 2022

Lot 2E : Place Frère-André and adjacent streets

  • Work operations in 2024-2025




To be informed, subscribe here to receive notice of work operations by email.

Phase 1 – Work on Rue Sainte-Catherine Ouest

Lot 1A: between De Bleury and Robert-Bourassa

  • Start of work operations in March 2019, continuing until the fall of 2019
  • Winter break
  • Resumption of work operations in May 2020
  • End of work operations in the fall of 2020

Lot 1B: between Robert Bourassa and Mansfield

  • Start of work operations in May 2020, continuing until the fall of 2020
  • Winter break
  • Resumption of work operations in the spring of 2021
  • End of work operations in the fall of 2021

Lot 2A: Square Phillips - decontamination of the old public toilets

  • Start and end of work operations in 2019

Lot 2D: Square Phillips and Rue Union

  • Start of work operations in October 2020
  • End of work operations in the summer of 2022

Lot 2E : Place Frère-André and adjacent streets

  • Work operations in 2024-2025
  • Work operation resumed on Square Phillips and Avenue Union (Lot 2D) and closures of Avenue Union and Rue Cathcart

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    08 Jan 2021
    supporting image

    Work operation resumed - Square Phillips and Avenue Union (Lot 2D)

    With the holiday break now over, work operations at Square Phillips are starting again as planned, and work operations aimed at rehabilitating obsolete infrastructures on Avenue Union are starting.

    When
    Starting on January 11, 2021


    Traffic obstacles

    • Complete closure of Avenue Union, between Cathcart and Sainte-Catherine O. (The northbound lane is already closed.)
    • Complete closure of Rue Cathcart, between Union and Place Phillips

    Nature of the work operations
    As part of underground infrastructure work and the redevelopment of Square Phillips and Avenue Union (Lot 2D), work operations on Avenue Union include:

    • Reconstruction of access pits connected to the electrical network at the corner of Cathcart/Union.
    • Reconstruction of underground infrastructures (water supply, electrical, telecommunications and gas networks) on Avenue Union.
    • Start of permanent redevelopment work on Avenue Union in the spring of 2021 (with the completion of work operations scheduled for the end of summer 2021).

    Impacts
    Traffic obstacles
    Removal of on-street parking. Indoor parking spaces will remain accessible nearby.
    Access to stores and buildings maintained at all times.
    Noise, vibrations and dust

    Work schedule
    Weekdays, daytime (7 a.m. to 4:30 p.m.)
    Possibility of work seven days a week (6.30 a.m.to 6 p.m. and 6.30 p.m. to 6 a.m.)


    The planning and scheduling of work operations can change based on weather conditions and unexpected work site contingencies.

    The city is aware of the inconveniences that these work operations may cause and is taking all the necessary measures to minimize the impacts. Thank you for your cooperation.


    COVID-19: New measures/continuation of work
    Work sites will continue to operate in accordance with the most recent health guidelines recommended by Québec’s public health authorities with respect to COVID-19.



  • Reopening of place Phillips avenue

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    16 Dec 2020
    supporting image


    Where :
    Reopening of the northbound traffic lane on Rue Place Phillips, between Cathcart and Sainte-Catherine Ouest.


    When :
    December 17, 2020.

    End of underground infrastructure work :

    • The reconstruction of underground infrastructures (water service, electrical, telecommunications and gas networks) has been completed.
    • The roads and sidewalks have been covered with temporary pavement.
    • Permanent redevelopment work will begin in the summer of 2021, with the work operations scheduled for completion by the end of 2021.

    Thank you for your collaboration.


    The planning and scheduling of work operations can change based on weather conditions and unexpected work site contingencies.



  • End of work operations in 2020 and upcoming work operations in 2021

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    08 Dec 2020
    supporting image

    The city is pleased inform you that work operations scheduled in 2020 on Rue Sainte-Catherine Ouest, between Mansfield and De Bleury, have been completed. There are no longer any obstacles for pedestrians, and the street has fully reopened to vehicle traffic.


    Rue Sainte-Catherine Ouest, between Robert-Bourassa and De Bleury (Lot 1A)

    Completion of redevelopment work on the road and sidewalks

    Work operations have been completed in full and on schedule between Robert-Bourassa and De Bleury.

    Please note that the reconstruction of underground infrastructures was completed in 2018 and 2019. The permanent redevelopment work carried out this year marks the end of the work operations and includes:

    • Sidewalks widened by more than 60 per cent
    • A single traffic lane
    • Roads and sidewalks reconstructed with concrete paving blocks
    • New street furniture
    • Eco-efficient lighting
    • Traffic lights for optimal management of pedestrian and vehicle mobility
    • Free WIFI network

    Please note that due to work by Hydro-Québec and to procurement delays (tree grates and storm drains), some minor work operations must still be carried out. However, these operations will have a negligible impact on pedestrian mobility and car traffic.


    Rue Sainte-Catherine Ouest, between Mansfield and Robert-Bourassa (Lot 1B)

    Underground infrastructure work completed

    Work operations on the roads and sidewalks: early spring 2021

    The reconstruction of underground infrastructures has been completed on schedule.

    These major work operations were required in order to rehabilitate century-old the sewer, water service, telecommunications and electrical networks.

    As part of work operations carried out beneath the road in 2020, the following elements were repaired and updated:

    • Sewer and water service networks
    • Underground electrical and telecommunications infrastructures
    • Gas network

    Please note that the road and the sidewalks have been covered with temporary pavement for the winter break in work operations. The future redevelopment work, including the permanent concrete block surfacing on the road and sidewalks, is scheduled to begin next spring, with the work operations slated for completion by the end of 2021.


    Square Phillips and Avenue Union

    Lot 2D – Infrastructure and redevelopment work

    Please note that infrastructure and redevelopment work at Square Phillips and on Avenue Union will continue during the winter period, with the completion of work operations scheduled for the summer of 2022.


    The municipal administration wishes to thank you sincerely for your collaboration during these work operations. Please stay safe.


  • Reopening of streets (Sainte-Catherine and McGill College)

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    08 Dec 2020
    supporting image

    Reopening of Rue Sainte-Catherine Ouest, between Metcalfe and McGill College

    Where
    On Rue Sainte-Catherine Ouest, between Metcalfe and McGill College

    When
    Monday, December 7, 2020

    Nature of the work
    Completion of reconstruction work on underground infrastructures.

    The road and sidewalks have been covered with temporary pavement for the winter break in work operations. The permanent redevelopment work, including the concrete block surfacing on the roads and sidewalks, will begin next spring, with the work operations slated for completion before the end of 2021.


    Reopening on the southbound lane on Avenue McGill College between Maisonneuve and Sainte-Catherine Ouest

    Where
    On Avenue McGill College between Maisonneuve and Sainte-Catherine Ouest.

    When
    Monday, December 7, 2020

    The parking exit at the Centre Eaton will be on Avenue McGill College southbound. The parking entrance can still be accessed from Boulevard De Maisonneuve Ouest.

    Nature of the work
    Avenue McGill College is being reopened before the completion of work operations in order to improve mobility in the area and provide better access to underground parking while facilitating co-existence with the REM work site (McGill station).


    The municipal administration wishes to thank you sincerely for your collaboration during these work operations. Please stay safe.


  • Upcoming and planned construction between now and spring 2021

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    02 Dec 2020

    Upcoming

    This notice concerning planned work operations is the final notice for the year 2020. Notices will resume in the spring of 2021.

    In order to receive timely information concerning emergency situations or major obstacles (water service, street closures, etc.), please subscribe to our Notices and Alerts

    Liaison officers for the Sainte-Catherine Redevelopment Project remain available, with the exception of the holiday period (December 19, 2020 to January 10, 2021 inclusively):

    Monday to Friday from 7:30 a.m. to 6 p.m.
    514-867-9339
    SainteCatherineOuest@montreal.ca

    For any worksite emergency during the holiday break, please call 311.


    Local water service interruption on night


    Where : Rue Place Phillips, between Sainte-Catherine O and René-Lévesque

    The liaision officer will advise merchants and abutting owners affected by water service interruptions 48 hours in advance via door hangers and the city’s Notices and Alerts service for subscribers.

    When : December 3 to 4, 2020, on night, from 10 p.m. to 6 a.m.

    These water service interruptions are the last of the year. The next ones are only planned for next spring.

    Nature of the work
    Work on water supply networks with localized water service interruptions at night. Water service interruptions are required on the low-pressure network. The low-pressure network is used for domestic purposes.

    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.

    Planned work operations – up to spring 2021

    The completion of underground infrastructure work on Rue Sainte-Catherine Ouest between Mansfield and Robert-Bourassa (Lot 1B) is scheduled for December 10, 2020. These major work operations were necessary in order to rehablitate the city’s century-old sewer, water service, telecommunications and electrical networks. Permanent development work on the sidewalks and the road will begin in the spring of 2021.

    Infrastructure and redevelopment work at Square Phillips and on Avenue Union (Lot 2D) will continue with no winter break this year.


    Rue Sainte-Catherine Ouest, between Robert-Bourassa and De Bleury
    Lot 1A – Reconstruction of underground infrastructures

    The installation of tree grates and storm drains will continue as they are received. This work will have a negligible impact on pedestrian mobility and car traffic.


    Rue Sainte-Catherine Ouest, between Mansfield and Robert-Bourassa
    Lot 1B – Reconstruction of underground infrastructures

    Work schedule
    7 days a week, on daytime (6:30 a.m. to 6 p.m.) and at night (6:30 p.m. to 6 a.m.)

    Work operations scheduled in 2020

    • Work on the sewer and water supply networks
    • Work on the electrical and telecommunications networks
    • Work on the gas network
    • Work on the curb and temporary road paving

    Expected impacts up to december 10, 2020

    • Complete closure on McGill College up to Metcalfe (closure of Mansfield intersection)
    • Partial hindrance on McGill College between Sainte-catherine and Cathcart (south direction)
    • Complete closure of Mansfield between Sainte-Catherine O and Cathcart
    • Noise, dust and vibrations
    • Pedestrian walkways deviation
    • Work on Sainte-Catherine Ouest, between Mansfield and Robert-Bourassa, will begin in spring 2021.

    Between McGill College and Metcalfe (including the intersection of Mansfield)

    • Work on the sewer and water supply networks
    • Work on the electrical and telecommunications networks
    • Work on the gas network
    • Work on the curb and temporary road paving
    • Demobilization of the works
    • Reopening of the street - scheduled for December 10, 2020

    Square Phillips and avenue Union, between rue Sainte-Catherine Ouest and Cathcart
    Lot 2D – Underground infrastructures and park redesign

    Work schedule

    • 7 days a week, on daytime (7 a.m. to 4:30 p.m.)
    • Without winter pause this year
    • Holiday break: December 19, 2020 to January 4, 2021 inclusively.
    • The completion of work operations is scheduled for the summer of 2022.

    Work operations scheduled up to spring 2021

    • Removal of curbs, drains and part of the paving on Rue Place Phillips
    • Archeological excavations prior to the work operations
    • Demolition of part of the old public toilets
    • Start of work operations on the water supply, electrical, telecommunications and gas networks
    • Start of work operations on the mechanical room for the water garden
    • Preparatory work for the restoration of the monuments

    Expected impacts up to spring 2021

    • Water service interruptions at night (probably the night of December 3rd to 4th) - rue Place Phillips. Residents concerned will be notified in advance.
    • Closure of Union Avenue northbound, between Cathcart and Sainte-Catherine O
    • Complete road closure of Place Phillips
    • Withdrawal of street parking places. Nearby indoor parking spaces remain accessible
    • Closure of pedestrian access to the square
    • Noise, dust and vibrations

    Square Phillips - park redevelopment

    Work operations planned UP to spring 2021

    • Work operations on the water supply on rue Place Phillips
    • Archeological excavations prior to the work operations
    • Work on the gas network
    • Work operations on the electrical and telecommunications networks
    • Installation of a berlin wall
    • Demolition of part of the old public toilets

    Avenue Union - Underground infrastructures and work on roads and sidewalks

    Work operations planned next for this year

    • Work on the gas network
    • Work operations on the water supply
    • Work operations on the electrical and telecommunications networks


    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.

    The municipal administration thanks you for your understanding and wishes you a joyful holiday season. Take good care.

  • Planned work operations – week of November 30 to December 5, 2020

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    25 Nov 2020
    supporting image

    The new Rue Sainte-Catherine Ouest is beginning to take shape.


    Local water service interruptions on night

    Where : Rue Sainte-Catherine O, between McGill College to the west of Mansfield
    Concerned buildings will receive door hangers to notify occupants 48 hours in advance.

    When : From November 23 to November 25, 2020, on night, from 10 p.m. to 6 a.m.

    Nature of the work
    Work on water supply networks with localized water service interruptions at night.

    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.

    Planned work operations – week of November 30 to December 6, 2020

    Rue Sainte-Catherine Ouest, between Robert-Bourassa and De Bleury
    Lot 1A – Work on roads and sidewalks

    The first section (Lot 1A) of the Sainte-Catherine Redevelopment Project is 99 per cent complete! Due to the pandemic, procurement schedules for tree grates and gutters have been subject to delays. In the meantime, temporary wooden protections have been added. The gradual installation of grates, as the city receives them, will have a negligible impact on car traffic and will mark the end of work operations.

    Benefits of the project

    The new development, with only one traffic lane and on-street parking removed, prioritizes an improved pedestrian experience. The sidewalks have been widened by 60 percent to give pedestrians more space, and wider sidewalks will also make it possible to install seasonal terraces. The addition of street furniture offers more options for relaxation, while the increased vegetation cover will make for a more pleasant walking experience and help curb heat island effects at the height of summer. The new development also integrates a range of intelligent systems. The Sainte-Catherine Ouest, as a result, is a more people-friendly thoroughfare that greatly improves the downtown pedestrian experience!

    Thank you for your patience and collaboration.


    Rue Sainte-Catherine Ouest, between Mansfield and Robert-Bourassa
    Lot 1B – Reconstruction of underground infrastructures

    Work schedule
    7 days a week, on daytime (6:30 a.m. to 6 p.m.) and at night (6:30 p.m. to 6 a.m.)

    Work operations scheduled in 2020

    • Work on the sewer and water supply networks
    • Work on the electrical and telecommunications networks
    • Work on the gas network
    • Work on the curb and temporary road paving

    Expected impacts next week

    • Complete closure between McGill College up to Metcalfe (closure of Mansfield intersection).
    • Complete closure of Mansfield between Sainte-Catherine O to Cathcart
    • Noise, dust and vibrations
    • Pedestrian walkways deviation

    Between Robert-Bourassa and McGill College (including the intersection of McGill College northbound)
    The street is reopen.

    On McGill College between Sainte-Catherine and Cathcart
    The avenue is reopen northbound.
    The south direction remains partially closed.

    Between McGill College to the west of Mansfield (including the intersection of Mansfield)

    Work operations planned next week
    Work on the water supply networks with localized (specifics addresses) water service interruptions at night (from 10 p.m. to 6 a.m.) Occupants of the buildings concerned will be advised.
    Work on the electrical and telecommunications network
    Work on the gas network
    Curbs and temporary road paving

    Upcoming work operations for this year
    Demobilization of the works and reopening of the street - scheduled for December 10, 2020.

    Square Phillips and avenue Union, between rue Sainte-Catherine Ouest and Cathcart
    Lot 2D – Underground infrastructures and park redesign

    Work schedule
    7 days a week, on daytime (7 a.m. to 4:30 p.m.)
    Without winter pause this year

    Work operations scheduled in 2020

    • Removal of curbs, drains and part of the paving on Rue Place Phillips
    • Archeological excavations prior to the work operations
    • Felling of three diseased trees and conversion into wood chips
    • Demolition of part of the old public toilets
    • Start of work operations on the water supply, electrical, telecommunications and gas networks
    • Start of work operations on the mechanical room for the water garden
    • Preparatory work for the restoration of the monuments

    Expected impacts next week

    • Water service interruptions at night (probably the night of December 3rd to 4th) - rue Place Phillips. Residents concerned will be notified in advance.
    • Closure of Union Avenue northbound, between Cathcart and Sainte-Catherine
    • Complete road closure of Place Phillips
    • Withdrawal of street parking places. Nearby indoor parking spaces remain accessible
    • Closure of pedestrian access to the square
    • Noise, dust and vibrations

    Square Phillips - park redevelopment

    Work operations planned next week
    Archeological excavations prior to the work operations
    Work on the gas network
    Installation of a berlin wall
    Work operations on the water supply on rue Place Phillips
    Demolition of part of the old public toilets
    Start of work operations on the electrical and telecommunications networks

    Upcoming work operations for this year
    Start of work operations on the mechanical room for the water garden

    Avenue Union - Underground infrastructures and work on roads and sidewalks

    Work operations planned next week
    Work on the gas network
    There is no work operations planned

    Upcoming work operations for this year
    Start of work operations on the electrical network


    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.

  • ERRATUM : Reopening a section of rue Sainte-Catherine O

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    19 Nov 2020
    supporting image

    Reopening of rue Sainte-Catherine Ouest, between Union Saint-Alexandre and De Bleury

    Where : Reopening to vehicular traffic of rue Sainte-Catherine Ouest, between Union and De Bleury

    When : From Saturday morning, November 21, 2020

    Nature of the work
    As part of the work on roads and sidewalks (Lot 1A) on rue Sainte-Catherine O, the Ville de Montreal is pleased to announce the reopening of the street to vehicle traffic, between Union and De Bleury. Work to install tree grates and drain grates continues.

  • Reopening a section of rue Sainte-Catherine O, local water service interruptions and planned work operations – week of November 23 to 29, 2020

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    17 Nov 2020
    supporting image

    Reopening of rue Sainte-Catherine Ouest, between Saint-Alexandre and De Bleury

    Where : Reopening to vehicular traffic of rue Sainte-Catherine Ouest, between Saint-Alexandre and De Bleury

    When : From Saturday, November 21, 2020

    Nature of the work : The Ville de Montréal is pleased to announce the end of work on this section of the rue Sainte-Catherine Ouest.


    Local water service interruptions on night

    Concerned buildings will receive door hangers to notify occupants 48 hours in advance.

    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.

    Where : Rue Place Phillips, between Sainte-Catherine O and René-Lévesque

    When : A water service interruption is planned between November 23 to November 29, 2020, on night, from 10 p.m. to 6 a.m.

    Nature of the work
    Work on water supply networks with localized water service interruption at night. Water service interruption is required on the low-pressure network. The low-pressure network is used for domestic purposes.

    Where : Rue Sainte-Catherine O, between McGill College to the west of Mansfield

    When : From November 23 to November 25, 2020, on night, from 10 p.m. to 6 a.m.

    Nature of the work
    Work on water supply networks with localized water service interruptions at night. Water service interruptions are required on the low and the high pressure network.

    Thank you for your collaboration.


    Planned work operations – week of November 23 to 29, 2020

    Rue Sainte-Catherine Ouest, between Robert-Bourassa and De Bleury
    Lot 1A – Work on roads and sidewalks

    PLEASE NOTE
    Due to COVID-19, materials supply has been delayed. It slows down operations and reduces work hours. To ensure safety, road closures remains.

    Work schedule
    Weekdays, on daytime (6:30 a.m. to 3:30 p.m.)

    Nature of the work in 2020

    • Construction and development of sidewalks and roads with concrete paving blocks
    • Installation of drainage gutters
    • Preparation of tree pits and tree planting
    • Work on the electrical and telecommunications network
    • Installation of street lighting and traffic lights
    • Installation of a digital display terminal and dynamic parking guidance signage
    • Installation of urban furniture
    • Implementation of Wifi Montreal


    Expected impacts

    • Complete closure of Rue Sainte-Catherine between Union and Saint-Alexandre
    • Closures at the following intersections: Place Phillips and Aylmer, as well as City-Councillors
    • Noise, dust and vibrations


    De Bleury to Saint-Alexandre
    End of work
    Reopen to vehicular traffic

    Saint-Alexandre to City-Councillors

    Work operations planned next week
    Waiting for materials supply

    Upcoming work operations for this year
    Tree grates installation
    Drain grates installation
    Implementation of Wifi Montreal

    City-Councillors to Aylmer (and rue Place Phillips)

    Work operations planned next week
    Installation of a digital display terminal and dynamic parking guidance signage

    Upcoming work operations for this year
    Tree grates installation
    Drain grates installation

    Aylmer (and rue Place Phillips) to Union

    Work operations planned next week
    Installation of a digital display terminal and dynamic parking guidance signage

    Upcoming work operations for this year
    Tree grates installation
    Drain grates installation

    Union to Robert-Bourassa

    Work operations planned next week
    Installation of a digital display terminal and dynamic parking guidance signage

    Upcoming work operations for this year
    Tree grates installation
    Drain grates installation


    Rue Sainte-Catherine Ouest, between Mansfield and Robert-Bourassa
    Lot 1B – Reconstruction of underground infrastructures

    Work schedule
    7 days a week, on daytime (6:30 a.m. to 6 p.m.) and at night (6:30 p.m. to 6 a.m.)

    Work operations scheduled in 2020

    • Work on the sewer and water supply networks
    • Work on the electrical and telecommunications networks
    • Work on the gas network
    • Work on the curb and temporary road paving


    Expected impacts next week

    • Complete closure between McGill College up to Metcalfe (closure of Mansfield intersection).
    • Complete closure of Mansfield between Sainte-Catherine O to Cathcart
    • Noise, dust and vibrations
    • Pedestrian walkways deviation


    Between Robert-Bourassa and McGill College (including the intersection of McGill College northbound)
    The street is reopen.

    On McGill College between Sainte-Catherine and Cathcart
    The avenue is reopen northbound.
    The south direction remains partially closed.

    Between McGill College to the west of Mansfield (including the intersection of Mansfield)

    Work operations planned next week
    Work on the sewer and water supply networks
    Work on the water supply networks with localized water service interruptions at night (from 10 p.m. to 6 a.m.) Occupants of the buildings concerned will be advised.
    Work on the electrical and telecommunications network
    Work on the gas network

    Upcoming work operations for this year
    Curbs and temporary road paving

    Square Phillips and avenue Union, between rue Sainte-Catherine Ouest and Cathcart
    Lot 2D – Underground infrastructures and park redesign

    Work schedule
    7 days a week, on daytime (7 a.m. to 4:30 p.m.)
    Without winter pause this year

    Work operations scheduled in 2020

    • Removal of curbs, drains and part of the paving on Rue Place Phillips
    • Archeological excavations prior to the work operations
    • Felling of three diseased trees and conversion into wood chips
    • Demolition of part of the old public toilets
    • Start of work operations on the water supply, electrical, telecommunications and gas networks
    • Start of work operations on the mechanical room for the water garden
    • Preparatory work for the restoration of the monuments


    Expected impacts next week

    • Water service interruptions at night - rue Place Phillips. Residents concerned will be notified in advance.
    • Closure of Union Avenue northbound, between Cathcart and Sainte-Catherine
    • Complete road closure of Place Phillips
    • Withdrawal of street parking places. Nearby indoor parking spaces remain accessible
    • Closure of pedestrian access to the square
    • Noise, dust and vibrations


    Square Phillips - park redevelopment

    Work operations planned next week
    Archeological excavations prior to the work operations
    Preparatory work for the restoration of the monuments
    Work on the gas network
    Installation of a berlin wall
    Work operations on the water supply on rue Place Phillips

    Upcoming work operations for this year
    Demolition of part of the old public toilets
    Start of work operations on the electrical, telecommunications and gas networks
    Start of work operations on the mechanical room for the water garden


    Avenue Union - Underground infrastructures and work on roads and sidewalks

    Work operations planned next week
    Work on the gas network
    There is no work operations planned

    Upcoming work operations for this year
    Start of work operations on the electrical network


    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.

  • Reopening of streets, water service interruptions and planned work operations – week of November 16 to 22, 2020

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    12 Nov 2020
    supporting image

    Commercial delivery zones : here

    Reopening of streets

    The Ville de Montréal is pleased to announce the end of work on certain sections of the rue Sainte-Catherine Street Ouest :

    From Tuesday November, 10, 2020

    • Pedestrianization of rue Sainte-Catherine Ouest, between Saint-Alexandre and De Bleury


    From Friday, November 13, 2020

    • reopening of rue Sainte-Catherine O, between McGill College and Robert-Bourassa
    • reopening of Avenue McGill College northbound, between Cathcart and Sainte-Catherine O

    (McGill College Avenue southbound remains closed).


    Local water service interruptions on night

    Concerned buildings will receive door hangers to notify occupants 48 hours in advance.
    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.

    Where : Rue Place Phillips, between Sainte-Catherine O and René-Lévesque

    When : November 16 to 22, 2020, on night, from 10 p.m. to 6 a.m.

    Nature of the work
    Work on water supply networks with localized water service interruptions at night. Water service interruptions are required on the low-pressure network. The low-pressure network is used for domestic purposes.

    Where : Rue Sainte-Catherine O, between McGill College to the west of Mansfield

    When :

    November 11 to 15, 2020, on night, from 10 p.m. to 6 a.m.
    Other water service interruptions are also planned on night during the week of November 16 to 22.

    Nature of the work
    Work on water supply networks with localized water service interruptions at night. Water service interruptions are required on the low and the high pressure network.

    Thank you for your collaboration.


    Planned work operations – week of November 16 to 22, 2020

    Rue Sainte-Catherine Ouest, between Robert-Bourassa and De Bleury
    Lot 1A – Work on roads and sidewalks

    PLEASE NOTE
    Due to COVID-19, materials supply has been delayed. It slows down operations and reduces work hours. To ensure safety, road closures remains.

    Work schedule
    Weekdays, on daytime (6:30 a.m. to 3:30 p.m.)

    Nature of the work in 2020

    • Construction and development of sidewalks and roads with concrete paving blocks
    • Installation of drainage gutters
    • Preparation of tree pits and tree planting
    • Work on the electrical and telecommunications network
    • Installation of street lighting and traffic lights
    • Installation of a digital display terminal and dynamic parking guidance signage
    • Installation of urban furniture
    • Implementation of Wifi Montreal


    Expected impacts

    • Complete closure of Rue Sainte-Catherine between Union and De Bleury
    • Closures at the following intersections: Place Phillips and Aylmer, as well as City-Councillors
    • Noise, dust and vibrations


    De Bleury to Saint-Alexandre

    Work operations planned next week
    End of the installation of drain grates.

    Upcoming work operations for this year
    Tree grates installation
    Implementation of Wifi Montreal

    Saint-Alexandre to City-Councillors

    Work operations planned next week
    Urban furniture installation

    Upcoming work operations for this year
    Tree grates installation
    Drain grates installation
    Implementation of Wifi Montreal

    City-Councillors to Aylmer (and rue Place Phillips)

    Work operations planned next week
    Urban furniture installation

    Upcoming work operations for this year
    Tree grates installation
    Drain grates installation
    Implementation of Wifi Montreal

    Aylmer (and rue Place Phillips) to Union

    Work operations planned next week
    Urban furniture installation

    Upcoming work operations for this year
    Installation of a digital display terminal and dynamic parking guidance signage
    Tree grates installation
    Drain grates installation
    Implementation of Wifi Montreal

    Union to Robert-Bourassa

    Work operations planned next week
    Bronze plate installation
    Urban furniture installation

    Upcoming work operations for this year
    Tree grates installation
    Drain grates installation
    Street lighting and traffic lights installation
    Installation of a digital display terminal and dynamic parking guidance signage
    Implementation of Wifi Montreal


    Rue Sainte-Catherine Ouest, between Mansfield and Robert-Bourassa
    Lot 1B – Reconstruction of underground infr
    astructures

    Work schedule
    7 days a week, on daytime (6:30 a.m. to 6 p.m.) and at night (6:30 p.m. to 6 a.m.)

    Work operations scheduled in 2020

    • Work on the sewer and water supply networks
    • Work on the electrical and telecommunications networks
    • Work on the gas network
    • Work on the curb and temporary road paving


    Expected impacts next week

    • Complete closure between McGill College up to Metcalfe (closure of Mansfield intersection) from this Friday, November 13, 2020
    • Complete closure of Mansfield between Sainte-Catherine O to Cathcart
    • Noise, dust and vibrations
    • Pedestrian walkways deviation


    Between Robert-Bourassa and McGill College (including the intersection of McGill College northbound)
    The street will reopen as of Friday, November 13, 2020.

    On McGill College between Sainte-Catherine and Cathcart
    The avenue will reopen northbound on Friday, November 13, 2020.
    The south direction remains partially closed.

    Between McGill College to the west of Mansfield (including the intersection of Mansfield)

    Work operations planned next week
    Work on the sewer and water supply networks
    Work on the water supply networks with localized water service interruptions at night (from 10 p.m. to 6 a.m.) Occupants of the buildings concerned will be advised.
    Work on the electrical and telecommunications network
    Work on the gas network

    Upcoming work operations for this year
    Curbs and temporary road paving

    Square Phillips and avenue Union, between rue Sainte-Catherine Ouest and Cathcart
    Lot 2D – Underground infrastructures and park redesign

    Work schedule
    7 days a week, on daytime (7 a.m. to 4:30 p.m.)
    Without winter pause this year

    Work operations scheduled in 2020

    • Removal of curbs, drains and part of the paving on Rue Place Phillips
    • Archeological excavations prior to the work operations
    • Felling of three diseased trees and conversion into wood chips
    • Demolition of part of the old public toilets
    • Start of work operations on the water supply, electrical, telecommunications and gas networks
    • Start of work operations on the mechanical room for the water garden
    • Preparatory work for the restoration of the monuments


    Expected impacts next week

    • Water service interruptions at night - rue Place Phillips. Residents concerned will be notified in advance.
    • Closure of Union Avenue northbound, between Cathcart and Sainte-Catherine
    • Complete road closure of Place Phillips
    • Withdrawal of street parking places. Nearby indoor parking spaces remain accessible
    • Closure of pedestrian access to the square
    • Noise, dust and vibrations


    Square Phillips - park redevelopment

    Work operations planned next week
    Archeological excavations prior to the work operations
    Preparatory work for the restoration of the monuments
    Work on the gas network
    Installation of a berlin wall
    Work operations on the water supply on rue Place Phillips

    Upcoming work operations for this year
    Demolition of part of the old public toilets
    Start of work operations on the electrical, telecommunications and gas networks
    Start of work operations on the mechanical room for the water garden

    Avenue Union - Underground infrastructures and work on roads and sidewalks

    Work operations planned next week
    Work on the gas network
    There is no work operations planned

    Upcoming work operations for this year
    Start of work operations on the electrical network

    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.

  • Local water service interruptions and planned work operations – week of November 9 to 15, 2020

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    04 Nov 2020

    Notice of local water service interruptions on night


    Where : Rue Place Phillips, between Sainte-Catherine O and René-Lévesque

    When :
    Between November 12, 2020 10 p.m. until the next morning 6 a.m.
    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.


    Nature of the work
    Work on water supply networks with localized water service interruptions at night. Water service interruptions are required on the low-pressure network. The low-pressure network is used for domestic purposes.

    Concerned buildings will receive door hangers to notify occupants 48 hours in advance.


    Where : Rue Sainte-Catherine O, between McGill College to the west of Mansfield


    When :

    From November 11 to November 15, 2020, From 10 p.m. to 6 a.m.

    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.


    Nature of the work
    Work on water supply networks with localized water service interruptions at night. Water service interruptions are required on the low and the high pressure network.


    Concerned buildings will receive door hangers to notify occupants 48 hours in advance.


    Thank you for your collaboration.



    Planned work operations – week of November 9 to 15, 2020


    Rue Sainte-Catherine Ouest, between Robert-Bourassa and De Bleury
    Lot 1A – Work on roads and sidewalks


    PLEASE NOTE
    Due to COVID-19, materials supply has been delayed. It slows down operations and reduces work hours. To ensure safety, road closures remains.


    Work schedule
    Weekdays, on daytime (6:30 a.m. to 3:30 p.m.)


    Nature of the work in 2020

    • Construction and development of sidewalks and roads with concrete paving blocks
    • Installation of drainage gutters
    • Preparation of tree pits and tree planting
    • Work on the electrical and telecommunications network
    • Installation of street lighting and traffic lights
    • Installation of a digital display terminal and dynamic parking guidance signage
    • Installation of urban furniture
    • Implementation of Wifi Montreal


    Expected impacts

    • Complete closure of Rue Sainte-Catherine between Union and De Bleury
    • Closures at the following intersections: Place Phillips and Aylmer, as well as City-Councillors
    • Noise, dust and vibrations


    De Bleury to Saint-Alexandre


    Work operations planned next week

    Urban furniture installation


    Upcoming work operations for this year

    Drain grates installation

    Tree grates installation

    Implementation of Wifi Montreal


    Saint-Alexandre to City-Councillors
    Work operations planned next week

    Urban furniture installation


    Upcoming work operations for this year

    Tree grates installation

    Implementation of Wifi Montreal


    City-Councillors to Aylmer (and rue Place Phillips)

    Work operations planned next week

    Urban furniture installation


    Upcoming work operations for this year

    Installation of a digital display terminal and dynamic parking guidance signage

    Tree grates installation

    Drain grates installation

    Implementation of Wifi Montreal


    Aylmer (and rue Place Phillips) to Union

    Work operations planned next week

    Installation of concrete paving on roads

    Urban furniture installation


    Upcoming work operations for this year

    Installation of a digital display terminal and dynamic parking guidance signage

    Tree grates installation

    Drain grates installation

    Implementation of Wifi Montreal


    Union to Robert-Bourassa

    Work operations planned next week

    Bronze plate installation

    Urban furniture installation


    Upcoming work operations for this year

    Tree grates installation

    Drain grates installation

    Street lighting and traffic lights installation

    Installation of a digital display terminal and dynamic parking guidance signage

    Implementation of Wifi Montreal


    Rue Sainte-Catherine Ouest, between Mansfield and Robert-Bourassa
    Lot 1B – Reconstruction of underground infrastructures


    Work schedule
    7 days a week, on daytime (6:30 a.m. to 6 p.m.) and at night (6:30 p.m. to 6 a.m.)


    Work operations scheduled in 2020

    • Work on the sewer and water supply networks
    • Work on the electrical and telecommunications networks
    • Work on the gas network
    • Work on the curb and temporary road paving


    Expected impacts next week

    • Complete closure between Robert-Bourassa up to Metcalfe (closure of Mansfield intersection)
    • Complete closure of Mansfield between Sainte-Catherine O to Cathcart
    • Complete closure of McGill College intersection
    • Complete closure on McGill College, south side of Sainte-Catherine, up to Cathcart
    • Noise, dust and vibrations
    • Pedestrian walkways deviation


    Between Robert-Bourassa and McGill College (including the intersection of McGill College)

    Work operations for this year are completed. Space temporarily used for equipment storage


    On McGill College between Sainte-Catherine and Cathcart

    Work operations for this year are completed. Space temporarily used for equipment storage


    Between McGill College to the west of Mansfield (including the intersection of Mansfield)

    Work operations planned next week

    Work on the sewer and water supply networks

    Work on the water supply networks with localized water service interruptions at night (from 10 p.m. to 6 a.m.) from Wednesday November 11, 2020 to Sunday November 15, 2020. Occupants of the buildings concerned will be advised.

    Work on the electrical and telecommunications network

    Work on the gas network


    Upcoming work operations for this year

    Curbs and temporary road paving


    Square Phillips and avenue Union, between rue Sainte-Catherine Ouest and Cathcart
    Lot 2D – Underground infrastructures and park redesign


    Work schedule
    7 days a week, on daytime (7 a.m. to 4:30 p.m.)

    Without winter pause this year


    Work operations scheduled in 2020

    • Removal of curbs, drains and part of the paving on Rue Place Phillips
    • Archeological excavations prior to the work operations
    • Felling of three diseased trees and conversion into wood chips
    • Demolition of part of the old public toilets
    • Start of work operations on the water supply, electrical, telecommunications and gas networks
    • Start of work operations on the mechanical room for the water garden
    • Preparatory work for the restoration of the monuments


    Expected impacts next week

    • Water service interruptions at night - rue Place Phillips. Residents concerned will be notified in advance.
    • Closure of Union Avenue northbound, between Cathcart and Sainte-Catherine
    • Complete road closure of Place Phillips
    • Withdrawal of street parking places. Nearby indoor parking spaces remain accessible
    • Closure of pedestrian access to the square
    • Noise, dust and vibrations


    Square Phillips - park redevelopment

    Work operations planned next week

    Archeological excavations prior to the work operations

    Preparatory work for the restoration of the monuments

    Work on the gas network

    Installation of a berlin wall

    Work operations on the water supply on rue Place Phillips


    Upcoming work operations for this year

    Demolition of part of the old public toilets

    Start of work operations on the electrical, telecommunications and gas networks

    Start of work operations on the mechanical room for the water garden


    Avenue Union - Underground infrastructures and work on roads and sidewalks

    Work operations planned next week

    Work on the gas network

    There is no work operations planned


    Upcoming work operations for this year

    Start of work operations on the electrical network


    The planning and scheduling of work operations may be subject to change based on weather conditions and unexpected work site contingencies.